Modernization mobile cranes

NRG Nuclear Research and consultancy Group

NRG Polar Crane

That's running... for 30,000 patients each day!

TES Industrial Systems B.V. has renewed the complete operating system of the Polar crane in the nuclear reactor of Nuclar Research & consultancy Group Petten. The durability of the crane is considerably extended. A technical feat, where the highest safety standards are applied. Three safety controls monitor and control the correct operation of the installation and ensure that a safety level PL-e is achieved.

 

The reliability of the crane must be extremely high, because 30,000 patients every day depend on medical radioisotopes from Petten in North Holland.
Kalmar, thank you for the great assignment to be able to provide this completely new electrical installation!